Development Projects:

Bangladesh Petroleum Corporation (BPC) undertook different development projects/activities to build up new infrastructures as well as to modernize the existing establishments with a view to improve POL products' import, handling, refining, storage and distribution facilities all over the country. Since inception (1977), BPC has implemented 29 development projects at total cost of about Tk.603 crore under bi-annual and different Five years  Plan.

In the Projects implemented, under implementation stage and future projects under planning stage, are presented here in under in the following tables. 

REMARKABLE PROJECTS IMPLEMENTED THE PERIOD

FROM MAY-1999 TO JUNE-2004


SL No Name of the Project Implementation Funding Source
1 BMRE of Eastern Refinery Limited (ERL)

FUTURE PROJECTS UNDER PLANNING.

Request for Expressions of Interest (EOI) from International Consulting Firms.
2 Construction of Dolphin jety at RM-5 and RM-6

1999-2004

The Project Was Implemented at a cost of Taka 52.00 Crores from BPC’s Own Fund.
3 Purchasing of two Aircraft Refueler for Hazarat Shajijalal International Air port 2004-2006

The Project Was Implemented at a cost of Taka 4.50 Crores From BPC’s Own Fund.

4 Construction of three nos 3000 MT Tanks at Parbotipur Depot 2002-2006

The Project was Implemented at a cost of Taka 4.50 Crores From BPC’s Own Fund.

5 Installation of an Aviation Depot at Shah Amanat International Airport, Chittagong. 2003-2008

The Project was Implemented at a cost of Taka 9.50 Crores From BPC’s Own Fund.

6 Construction of a Condensate Tank at ERL  2000-2002

The Project was Implemented at a cost of Taka 34.37 Crores From BPC’s Own Fund.

7 Feasibility study of BMRE of ERL, (With Deep Sea Unloading facilities of Crude oil and Refined products) 2006-2009

The Project was Implemented at a cost of Taka 1.77 Crores From BPC’s Own Fund.


PRESENT PROJECTS UNDER IMPLEMENTATION STAGE.

SL No Name of the Project Implementation Funding Source
1 Installation of Radar Type Aut Tank gauging At ERL.

July 2007

June 2010

At a cost of Taka 3.50 Crores from BPC’s Own Fund.
2 Reverse Osmosis Water Treatment Plant at ERL. Sept 2005 Dec 2010

At a cost of Taka 4.00 Crores from BPC’s Own Fund.

3 Construction of Jomuna Office Building at Dhaka July 2003 Dec 2010

At a cost of Taka 8.78 Crores from BPC’s Own Fund.

4 White Oil Pipe Line From DoJ-7 to LJ-4 May 2008 Dec 2010

At a cost of Taka 2.83 Crores from BPC’s Own Fund.

5 Construction of Mongla Oil Installation. Sept 2009 Sept 2012

At a cost of Taka 43.92 Crores from BPC’s Own Fund.

6 Construction of a MS Storage Tank (17,500MT) July 2009 June 2012

At a cost of Taka 21.50 Crores from BPC’s Own Fund.

7 Construction of a Deep Sea Unloading Facility for Crude Oil and Refined Products. July 2009 June 2012

At a cost of Taka 954.28 Crores from BPC’s Own Fund.


FUTURE PROJECTS UNDER PLANNING.

SL No Name of the Project Implementation Funding Source
1 BMRE of Eastern Refinery Limited (ERL)

2010-2013

If Fund is available....
2 Construction of BPC’s Own Building (10 Stored with Basement Parking Facitlity 2010-2013

From BPC’s Own Fund.

3 Construction of Frunace oil Tanks at ERL and Oil Co’s MI/Depot (58,000MT) 2010-2013

From Oil Marketing Co’s Own Fund

4 Construction of HSD Tanks at Oil Co’s MI/Depot (1,35,000MT) 2010-2013

From Oil Marketing Co’s Own Fund

5 Construction of Jet al Tanks at POCL MI/ Depot (20,000MT) 2010-2011

From POCL’s Own Fund.

6 Installation of Pipe line from Chittagong to Dhaka, and Dhaka to Baghabari. 2010-2013

If Fund is available...